Okotoks · Alberta, Canada
Ageing controllers, rising callbacks and inspection orders are the three reasons Okotoks owners call us. We turn them into a phased modernization plan.
Services
| Full modernization | End-to-end modernization from survey to AEDARSA acceptance. |
| Inspection orders & compliance | Compliance follow-up after local inspections, documented for your records. |
| Condition survey & planning | A 10-year elevator capital plan for boards and owners. |
| Multi-car & high-rise projects | Group-control upgrades and phased work on multi-car banks. |
| Accessibility upgrades | LULA and platform lifts for low-rise and heritage buildings. |
| Post-modernization maintenance | A maintenance programme matched to the modernized system. |
FAQ
Usually several weeks per car, depending on scope. We phase multi-car buildings so at least one elevator keeps running.
Work follows the elevator safety code (ASME A17.1 / CSA B44) as adopted in Alberta, and devices are licensed and inspected by AEDARSA.
When parts for the controller are hard to source, callbacks are rising, or inspection orders keep recurring. A condition survey shows whether you're there yet.
Equipment age and type, controller generation, parts availability, inspection history, callback log review and a recommended scope.
Cost depends on the number of cars and stops, whether the machine is replaced, door equipment and finishes. A condition survey produces an itemized scope and cost range; phasing spreads the spend.
Calgary Region
Owners across the Calgary Region area tell us the same story: the elevators still run, but parts take weeks and every breakdown costs tenants a day. Modernizing before the controller fails completely is cheaper and far less disruptive.
Every project is closed out with test records and documentation ready for AEDARSA acceptance.
Cold winters, road salt and grit wear door sills and tracks, and hydraulic cars slow down in unheated spaces.
How it works
Every car documented: age, controller, parts and history.
A written modernization scope with options.
Phasing that keeps the building moving.
Commissioning, inspection and handover documents.
Compliance
Nearby